N21-R042
Pump Replacement Projects
2021-03-03
Latitude: 8.91339, Longitude: 7.08424
open map
Letter Of Appreciation We, Dabi Gbesa Community write to appreciate the director and board of Lifewater for fixing the handpump and borehole in our communty. We Say Thank You Idris Umar
Gbesa Dabi This community boasts of public water supply right next to the hand pump. However, pressure seem to be more on the hand pump that on the public water supply because the public hardly comes (once every week). Such considerable pressure on the hand pump as an alternative lead to frequent break down. With the Afridev, pump we just installed, there is higher probability that the pumps will last a lot longer. The community is very grateful.
Well Depth: | 90 ft. | Turbidity: | Clear |
Depth of Water: | 40.00 ft. | Water Colour: | Clear |
Well Yield: | 8.00 gpm | Water Odour: | None |
Screen Length: | 0.00 ft. | Taste: | Good |
Casing Diameter: | 0.00 in. | Nitrate: | |
Handpump: | Afridev | Iron: | |
Developed By: | pH: | ||
Development Time: | Bacti Test: | ||
Disinfection: |