Lifewater.ca Logo HOME ABOUT PROJECTS CRISIS RESOURCES VISUALIZE DONATE
H16-E008
Containers for supplies on New Loading Dock
Nearly completed Loading Dock
Retaining Wall behind load block Being Prepared
Generator house located behind loading dock and container
The drill team in Haiti thank
Insitu Contractors Inc (Guelph, ON)

For building their capacity with Loading dock & Equipment Containers

Testimonial

We are so happy with this new loading dock. No longer will we have to unload heavy supplies unsafely. Now with our new loading bay, we can easily cart out our parts and pumps, rebar and cement with ease and our backs and bodies thank you for this excellent work. It is a rich blessing to us and we give you our heartfelt deepest gratitude for this good work.. May the good Lord whom we serve, bless you and keep you safe and full of His joy that knows no bounds. Sincerely Hanania Lfewater D;Haiti Drill team Coordinator

Project Summary

Well Details

Project Completed: 2016-03-01 Well Depth: 0 ft.
Depth of Water: 0.00 ft. Casing Diameter: 0.00 in.
Screen Length: 0.00 ft. Developed By:
Development Time: Well Yield:
Disinfection: Handpump:
Water Colour: Water Odour:
Turbidity: Taste:
Nitrate: Bacti Test:
Iron: pH:




Every $1 you give provides a child with safe water for a year!


457 Heather Crescent
Thunder Bay, ON P7E 5L1
Canada

Tel:
+1 807-622-4848
Email:
info@lifewater.ca
Lifewater.ca Logo
Lifewater.ca

Search
Site map
F.A.Q.



Connect with us on facebook

Copyright © 2018. All rights reserved.