Lifewater.ca Logo HOME ABOUT PROJECTS CRISIS RESOURCES VISUALIZE DONATE
H16-E007
Completed 1st Story Frame
Ready for Final Step of 1st Story
Finishing Ceiling Rebar
Overview of Structure
God's Promise
The drill team in Haiti thank
Ruth & Les Babcock (Bow Island, AB)
Fellowship of Man (Toronto, ON)

For building their capacity with Multi-Purpose Building - 1st floor

Testimonial

Dear Sir/Madame, We are standing in awe, our minds full of amazement that the multipurpose building has gotten built so quickly. Already the first story has been completed and for that we give the Lord all the praise. It was good to help in building this structure, we all learned a lot and many people in the local area received good work that helped their families a lot. We look forward to working on the next stage this coming fall. With much thanks for all you are doing to help Haiti grow and receive the safe water that they need. Hanania and the team

Project Summary

Well Details

Project Completed: 2016-04-04 Well Depth: 0 ft.
Depth of Water: 0.00 ft. Casing Diameter: 0.00 in.
Screen Length: 0.00 ft. Developed By:
Development Time: Well Yield:
Disinfection: Handpump:
Water Colour: Water Odour:
Turbidity: Taste:
Nitrate: Bacti Test:
Iron: pH:




Every $1 you give provides a child with safe water for a year!


457 Heather Crescent
Thunder Bay, ON P7E 5L1
Canada

Tel:
+1 807-622-4848
Email:
info@lifewater.ca
Lifewater.ca Logo
Lifewater.ca

Search
Site map
F.A.Q.



Connect with us on facebook

Copyright © 2018. All rights reserved.