H16-E003
Complete Leveling of Rear Workarea
Moving Large Amounts of Dirt!
Preparing the Future Site of the Maintenance Garage
Wayne .. In the beginning ...
The drill team in Haiti thank
Wayne and Connie Robertson & Family (Petrolia, ON)
Jim and Lynda Gehrels (Thunder Bay, ON)

For building their capacity with Levelling Haiti Equipment yard

Testimonial

Dear Sir/ Madame As the Lifewater D'Haiti team, we are amazed at the effort that has gone into leveling this very uneven piece of property. There were times that we feared the backhoe would topple but the Lord watched over us and we are now enjoying our new compound eagerly awaiting further work to complete the work area this coming winter. We offer to you our heartfelt thanks for all the hard work you put in to make this construction project a success. With much thanks and prayers that the Lord bless you and your family. Lifewater D'Haiti Drill Team

Project Summary

Well Details

Project Completed: 2016-02-11 Well Depth: 0 ft.
Depth of Water: 0.00 ft. Casing Diameter: 0.00 in.
Screen Length: 0.00 ft. Developed By:
Development Time: 0.00 hrs. Well Yield: 0.00 gpm
Disinfection: 0.00 hrs. Handpump:
Water Colour: Water Odour:
Turbidity: Taste:
Nitrate: 0.000 mg/L Bacti Test:
Iron: 0.000 mg/L pH: 0.000




Every $1 you give provides a child with safe water for a year!


457 Heather Crescent
Thunder Bay, ON P7E 5L1
Canada

Tel:
+1 807-622-4848
Email:
info@lifewater.ca
Lifewater.ca Logo
Lifewater.ca

Search
Site map
F.A.Q.



Connect with us on facebook

Copyright © 2017. All rights reserved.