H15-E008
Nearly Completed Main Septic Field
Preparing to lay Septic Pipes
Lower Septic Tank
Upper solids Tank and Lower Tank
Armouring the Lower Septic slope
The drill team in Haiti thank
The Fellowship of Man (Toronto, ON)

For building their capacity with Communal Septic System

Testimonial

Dear Sir / Madame, This is a very challenging property to install a septic field on, but with the help of our amazing backhoe operator, we were able to level an area half way up the first hill between the office and the main building. With 2 tanks connected to the septic field the system is ready for use. We are very grateful for your support in this work which although difficult became a bit of a work of art with the armoring to secure the front slope. When it is completed, there will be a flag pole placed there with the Haiti and Canadian flag. Thank you so much for helping us with this project. Lifewater d'Haiti team

Project Summary

Well Details

Project Completed: 2014-12-22 Well Depth: 0 ft.
Depth of Water: 0.00 ft. Casing Diameter: 0.00 in.
Screen Length: 0.00 ft. Developed By:
Development Time: Well Yield:
Disinfection: Handpump:
Water Colour: Water Odour:
Turbidity: Taste:
Nitrate: Bacti Test:
Iron: pH:




Every $1 you give provides a child with safe water for a year!


457 Heather Crescent
Thunder Bay, ON P7E 5L1
Canada

Tel:
+1 807-622-4848
Email:
info@lifewater.ca
Lifewater.ca Logo
Lifewater.ca

Search
Site map
F.A.Q.



Connect with us on facebook

Copyright © 2018. All rights reserved.