Project #:

H14-R023

Project Type:

Pump Replacement Projects

Project Date:

2014-01-09


The People of

Camp Louise Bazin

, Haiti

are thankful for the generous support of

Automation Now

(Thunder Bay, ON)
for helping rehabilitate their broken well and reestablish their access to safe water

Latitude: 19.7239, Longitude: -72.34273
open map


A message from the community

Dear sir: We suffered a lot with the first pump we have before as it keep breaking. Now Lifewater has blessed us with a new pump, which is much easier to use than the pump we have before. We would like to express our thanks to Lifewater! We knew that it would cost a lot more money for a new pump like that, and we just didn't have the funds to replace it. But with helping Lifewater obtain cement and sand, and labour we were able together to get the job done.. We thank God for these blessings. Joceline Bolivard Well caretaker


Some community details (provided by our in-country partners)

Serial # 1097 Water hardness 0 ppm Population accessing well regularly is about 600 people.


Well Details

Well Depth: 65 ft. Turbidity: Clear
Depth of Water: 30.00 ft. Water Colour: Clear
Well Yield: 2.50 gpm Water Odour: None
Screen Length: 10.00 ft. Taste:
Casing Diameter: 4.00 in. Nitrate: 0.000 mg/L
Handpump: Afridev Iron: 0.010 mg/L
Developed By: Mud Pump pH: 7.000
Development Time: 2.00 hrs. Bacti Test: Negative
Disinfection: 12.00 hrs.

Drawing Water from new Pump

Drawing Water from new Pump

Many People waiting for Water

Many People waiting for Water

Busy new Pump

Busy new Pump

Repair team at pump

Repair team at pump

Child watching team working

Child watching team working



For just over $1 you can provide a child with safe water for a year!

HOME

OUR STORY

RESOURCES

GET INVOLVED

DONATE

CONTACT US
457 Heather Crescent
Thunder Bay, ON P7E 5L1, Canada
+1 807-622-4848
BN: 885420737RR0001
info@lifewater.ca



Facebook Logo    Camera Glyph Icon

Copyright © 2025. All rights reserved.